Control-command system for the treatment of the temperatures of the various bearing of the shaft line between the junction boxes in the machine room and KBS cabinets in the electrical building.




Following the renovation of the TAC MAN fire system at the Penlyn Cattenom, Golfech and St Alban sites (France).


Renovation of the RIC control system (Incore neutron flux measurement) on the entire 1450MW NPP (4 units: 2 units of CIVAUX and 2 units of CHOOZ).




Study, design and deployment on site of RIC002AR cabinet.


Providing for each 34 generations units of the 900 MW EDF’s series, a calculator allowing the monitoring of the map process and the control of the whole system. Revamping ofmonitoring and control associated to the INCORE intrumentation RIC, positioning control of Rods.




Remote control of combustion turbines (TAC) at EDF Nuclear Power Plant (NPP)


1E revolution measurement and overspeed protection for Diesel generator on Mochovce 3 & 4 NPP – VUJE
Temperature monitoring of GTA (Turbo Alternator Group) shaft lines for 20 units of 1300MW EDF NPP

News

  • 26 July 2018
    Did you see us on our stand at the World Nuclear Exhibition in Paris from June 26 to 28, 2018 - http://www.world-nuclear-exhibition.com/fr/Accueil/
  • 13 July 2018
    « Action nettoyage – Wallonie plus propre » in collaboration with SUSA from Mons on July 13th, 2018
All news