Upgrade of the 1ES qualified SPS of existing equipment’s in order to implement the new protection functions.




Supply and installation of new CEC MRH2000 modules inDoel 1 and Doel 2 following 1E qualification.


Studies, implementation, installation and commissioning of the process control system for the Long Time Operation program that incorporate an additional fallback system on Unit 1 of the Tihange Nuclear Power Plant.




Revamping of level regulation of the steam generators for Tihange 2 (Belgium) in order to supply a scalable system from an analog to digital technology.


Renovation of the ventilation control system of Doel 1 & 2 control room following 1E qualification.





Revamping of the SIP (Process Instrumentation System) control and monitoring on Tihange 1 (NPP).

SIP is linked to the reactor’s thermodynamic values (temperatures, flow rates, pressures, levels,…)


News

  • 26 July 2018
    Did you see us on our stand at the World Nuclear Exhibition in Paris from June 26 to 28, 2018 - http://www.world-nuclear-exhibition.com/fr/Accueil/
  • 13 July 2018
    « Action nettoyage – Wallonie plus propre » in collaboration with SUSA from Mons on July 13th, 2018
All news