NATIONAL NUCLEAR PRODUCTION AND RMS (RADIATION MONITORING SYSTEM)

Upgrade of the 1ES qualified SPS of existing equipment’s

in order to implement the new protection functions.

 

 

 

 

 

 

 

Supply and installation of new CEC MRH2000 modules

inDoel 1 and Doel 2 following 1E qualification.

 

 

 

 

 

 

 

Studies, implementation, installation and commissioning of

the process control system for the Long Time Operation

program that incorporate an additional fallback system on

Unit 1 of the Tihange Nuclear Power Plant.

 

 

Revamping of level regulation of the steam generators for

Tihange 2 (Belgium) in order to supply a scalable system

from an analog to digital technology.

 

 

Renovation of the ventilation control system of Doel 1 & 2

control room following 1E qualification.

 

 

 

Revamping of the SIP (Process Instrumentation System)

control and monitoring on Tihange 1 (NPP).

SIP is linked to the reactor’s thermodynamic values

(temperatures, flow rates, pressures, levels,…)